Summer Projects

PUBLIC WORKS 2016 SUMMER PROJECTS:  EXPECT STREET CLOSURES AFTER JUNE 16

View the 2016 Slurry Seal Schedule Here

UPDATE: Streets originally scheduled to be slurried on Thursday, June 16 have been rescheduled to Friday, June 24 because of weather concerns.
Slurry seal work will begin Friday, June 17th and operations are expected to last until the evening of Friday, June 24th. Slurry operations will occur between 8:00 a.m. and 5:00 p.m. We anticipate access to your driveway will be closed for about four hours on the day your road is slurried. Although we cannot predict exactly when the four hour closure will occur, we thank you for your patience and cooperation while we make these improvements.

This summer there will be two Town construction projects that will affect traffic in various locations, starting in June.    

1.  Mariner Way Storm Drain
This project will affect traffic on Mariner Way and on Tiburon Boulevard between Mar West and Lyford Drive.  The work on Tiburon Boulevard will not begin until after the end of the school year.

2.  Slurry Seal Project
Last year there was a project to repair potholes and failing sections of roadway on 30 roadway segments* around the Town. We noted then that a different contractor would be returning this year to slurry seal those road segments.

What is a Slurry Seal?
Slurry seal is applied in a thin coat and takes time to dry.  Affected roadway segments need to be closed during the slurry process until the slurry has dried. This operation can take a few hours and is weather dependent.

If you drive across slurry before it has set you will (1) Damage the slurry, (2) Splatter your car with asphalt and (3) Track it onto your driveway.

It is important that you obey all flaggers, for the above reasons, and for the safety of the workers.

The major slurry work is currently planned to start June 13 and last two weeks.  Work on any one road segment will take between a half day and two days, depending on the segment size, and whether the road needs to slurried on one side and then the other.

Notices will go out in advance of the slurry work.  Roads will also be posted for “No Parking” for the day the slurry will occur.  As in every construction project, schedules are subject to change. 

Please remove your cars from the roadway early in the day to avoid delaying the contractor, as this will impact the schedule, as well as your neighbors.

Finally, if you have vegetation that extends into the street please cut it to in back of the curb prior to June 13th.

The Town of Tiburon's Department of Public Works thanks you for your cooperation in both of these important projects that both enhance and maintain our community’s infrastructure.  


LIST AND EXTENT OF ROADWAYS TO BE SLURRY SEALED

Road

From

To

Acela Dr

Lyford Dr

end

Auburn Ct

Stewart Dr

Cul-de-sac

Audery Ct

Acela

Cul-de-sac

Berke Ct

Acela

Cul-de-sac

Burrell Ct

Warrens

Cul-de-sac

Comstock Drive

Stewart

east end

East Terrace

Reed Ranch

Cul-de-sac

Gilmartin

Tiburon Blvd

Cul-de-sac

Irving

Jefferson

Cul-de-sac

Jefferson Dr

Tiburon Blvd

end

Lower North Terrace

Terrace Ct

Reed Ranch

Mateo Drive

Paradise

end

Mercury

Juno

Trestle Glen

North Terrace

East Terrace

Lower North Terrace

Redding Ct

Stewart

Cul-de-sac

Reed Ranch Rd

East Terrace

135 ft So Via Capitrano

Roseville Ct

Stewart

Cul-de-sac

Round Hill Dr

Lyford Dr

200 ft west of Mt Tiburon Rd

Silverado

Stewart

Cul-de-sac

Sonora

Stewart

Cul-de-sac

Southridge Dr

Southridge East

Cul-de-sac

Southridge East

Southridge Dr

Cul-de-sac

Southridge West

Southridge Dr

Cul-de-sac

Stewart Drive

Tiburon Blvd

Silverado

Stewart Drive

Roseville

Redding Ct

Stewart Drive

Redding Ct

Porto Marino

Sutter Ct

Tenaya

Cul-de-sac

Tenya Dr

Stewart

end

Upper North Terrace

Terrace Ct

Lower North Terrace

Virginia Drive

Stewart

east end

Virginia Drive

Stewart

west end

Warrens Way

Reed Ranch

end